Working under the main piling contract for MGI Piling, Belpile undertook a design and construct package for the limited headroom piling works at the terminal expansion site. The project involved working in both landside and airside environments, in both limited headroom (4.0m) and space to strengthen the existing building foundations for the proposed expansion.
Belpile undertook additional early works soils testing and designed/installed a 450mm diameter sectional CFA solution which was tied into the existing footings. Belpile delivered the package on time and within budget, working within a very difficult operational environment.